|
OKI Selected as Representative
Organization for JAXA Space Strategy Fund Project
Proposed Jointly with LTS
OKI has been selected as the
representative organization for the technology
development project titled “Development and Global
Deployment of a Next-Generation Infrastructure
Monitoring System Through Close Integration of
Satellites and Ground Sensors,” proposed jointly with
LTS, Inc. (Head office: Minato-ku, Tokyo; President and
Representative Director: Hiroaki Kabashima; “LTS”). The
project comes under the technology development theme
“Acceleration of Implementation of Satellite Data
Utilization Systems: (A) Development and Demonstration
of Satellite Data Utilization Systems” within the open
call program of the Japan Aerospace Exploration Agency
(JAXA)’s Space Strategy Fund (Note 1) (Second Phase).
The project involves integrating satellite data, sensor
data, and existing data to enable the early detection of
signs of abnormalities in customer infrastructure,
thereby contributing to more advanced inspection
operations, faster maintenance decision-making, and
reduced maintenance workloads in the future. Overall,
the goal is to shift infrastructure management from the
conventional reactive approach to preventive
maintenance.
In recent years, the impacts of
climate change have intensified natural disasters such
as landslides and sinkholes on a global scale. In
addition, the aging of infrastructure due to
urbanization and progressing underground development has
emerged as a serious social issue. Many such disasters
are known to be preceded by early warning signs in the
form of millimeter-scale ground surface deformation.
However, conventional satellite observation data has
limitations in terms of observation frequency and
accuracy, while ground-based sensors have a limited
measurement range, and inspection records are difficult
to acquire frequently. Against this backdrop, creating a
continuous high-precision monitoring platform combining
multiple data sources would make it possible to detect
the warning signs of major disasters with high accuracy.
However, since no current system adequately meets these
requirements, OKI has decided to develop an
infrastructure monitoring system capable of such
integrated monitoring.
In this project, OKI will draw on
its ground-based IoT sensor technologies to acquire
high-precision ground observation data. These
technologies include the easy-to-install and highly
reliable Zero-Energy IoT Series, which has an
operational track record at approximately 1,000
locations in Japan and has also been demonstrated in
Türkiye and Indonesia. These technologies will be
combined with AI technology to be developed by LTS to
develop a next-generation infrastructure monitoring
system that highly integrates wide-area data acquired
from satellites (such as changes in the ground),
localized data from IoT sensors installed on the ground
(such as tilt), and existing inspection and survey data
held by operators. Customers will be able to establish a
monitoring framework without relying solely on field
patrols and visual inspections, detect signs of
abnormalities at an early stage, and prioritize
maintenance activities. Additionally, the use of
easy-to-install sensors is expected to reduce the burden
of on-site construction work during system
implementation.
OKI will lead overall management of
the project and promote collaboration with overseas
partners to drive global social implementation, with the
aim of expanding into overseas markets, including
Türkiye and Southeast Asia. Going forward, OKI will
continue to build on its technological capabilities
cultivated in the social infrastructure field to
strengthen its efforts to create value and resolve
social issues on a global scale.
Project Overview
Technology development project
title: Development and Global Deployment of a
Next-Generation Infrastructure Monitoring System Through
Close Integration of Satellites and Ground Sensors
Organizations involved: Oki
Electric Industry Co., Ltd. (representative
organization), LTS, Inc. (partner organization)
Project period: From the date of
project contract signing until the end of March 2029
(scheduled)
Support period: The initial subsidy project period
extends from the date of the subsidy grant
|
|